|
DRILLING PROJECT SERVICES ENGINEERS • DISTRIBUTORS • DESIGNERS • CONSULTANTS
|
|
|
OPERATOR TRAINING COURSE OPTIMISATION OF TRICONE DRILLBIT PERFORMANCE Training is conducted in the form of lectures, with the extensive use of visual aids, followed up by on-site practical observation and training. We can modify our format to meet virtually any client requirements. Many clients have found an improvement in drillbit performance and a reduction in drilling costs, after conducting these courses at their mines. CONTENTS 1. INTRODUCTION 2. BASICS OF THE TRICONE 3. HOW DOES A ROCKBIT WORK? 4. FACTORS THAT AFFECT DRILLBIT PERFORMANCE - Pulldown Pressure - Rotary Speed - Air - Water - Operator 5. DRILLING IN DIFFERENT FORMATIONS - Starting The Hole - Boulders In Soft Material - Clay Formations - Normal Formations - Very Hard Formations - Areas With Lots Of Groundwater 6. PROBLEM IDENTIFICATION - Bent Drillrod - Excessive Pulldown Pressure - Plugged Drillbit - Inaccurate Rotation Speed Gauges - Insufficient Bailing Air / Wrong Drillbit Nozzle Size 7. WHY DO WE USE DECKBUSHES, STABILISERS, SHOCKSUBS & THREAD LUBRICANTS? 8. THERE ARE SEVERAL POINTS TO REMEMBER 9. CONCLUSION
|
|
|